The foundation is now complete. The roadway was put down on the 4th of March, and then on the 5th, when it would have been my Mum’s birthday, the sun shone and the concrete was poured. No lorries fell in ditches or got stuck in mud. No wooden shuttering collapsed under load. Now today the concrete has cured enough to allow the shuttering to be removed, and you can see the foundation slab in all its glory.